Akruti Elegance, Gavanpada, Mulund East

Constructions of Steel Pipeline & SS316 Tubes

Installing and maintaining oil and natural gas pipeline systems can be a major undertaking, but SICOM is equipped with the innovation, capabilities, and resources to meet any demand on-time and on-budget.

  • We have the expertise to safely complete any project while maintaining complete environmental compliance and minimizing impact to land owners.
  • We provide gathering, upstream, midstream and distribution construction services for oil and natural gas pipelines.
  • Our experienced staff works to achieve the highest levels of safety and quality for each project, ensuring that the oil and natural gas pipeline can withstand extreme pressure and environments with long-term reliability and safety. In urban and rural environments, our trenching capabilities allow us to minimize disruptions to traffic, homeowners, and businesses, as well as coordinate with multiple other companies to integrate various utilities and communications services in one trench. In rural or remote areas, we utilize specialized equipment to quickly move earth and cut through rock.

Activities involved in construction of steel pipeline

  • Surveying, Hazard Identification & Risk Assesment.
  • Clearing the Area.
  • Grading.
  • Top soil segregation.
  • Digging the trench.
  • Shifting &Stringing.
  • Pipe bending& Welding.
  • NDT test.
  • Surface Coating.
  • Inspection & Repair.
  • Lowering Pipeline into trench.
  • Backfilling.
  • Hydrotesting.
  • Restoring.

Construction of SS 316 Tubing

Stainless Steeltubing is designed to withstand extreme high pressures associated with transporting compressed natural gas. Conventional stations use shorter lengths to transport CNG.

We have a experts for laying & construction of SS tubing, trained by “SWAGELOK” and with help of Parker & Swagelok make fabrication tools we are enough capable to minimize the defect &inconvenient repairs caused by workmenships.

We have installed 15000 running meter SS tube at more than 40nos. CNG gas stations (Incl. Mother & Daughter Stations).

Activities involved in Laying of stainless steel tube

  • Surveying, Hazard Identification & Risk Assesment.
  • Trench Cover Opening.
  • Shifting & Stringing.
  • Tube Laying, Bending& Fitting installtion.
  • Clamping.
  • Testing, Inspection & Repair.
  • Trench Cover Closing.
  • Report Preparation & Certification.